Structural and Civil Engineering Case Studies in London

Selected projects across London and the South East: structural and civil engineering deliverables including surveys, calculations, steel beam design, drainage design and Building Control-ready packages, with outcomes described plainly.

Residential

Open-Plan Kitchen Conversion — Victorian Terrace

Hither Green, Lewisham
March 20242 weeks — design to Building Control submission
The Situation

The homeowners wanted to remove the internal wall between the rear reception room and the kitchen to create an open-plan living space. Their builder had indicated the wall was 'probably load-bearing' but had not confirmed this.

What We Delivered

Site visit and load path assessment confirming the wall as load-bearing, carrying a floor joist at mid-span. Universal Beam design with padstone specifications at each bearing, full calculations, coordinated drawings, and Building Control-ready submission pack. Temporary propping sequence included in notes to the contractor.

Building Control approval obtained without queries. Works completed without on-site structural issues. The open-plan space was delivered on programme and within the original contractor estimate.

Residential

Loft Conversion with Dormer — Edwardian Terrace

Blackheath, Greenwich
June 20243 weeks — coordinated with planning consent
The Situation

An Edwardian mid-terrace property requiring conversion of the loft into a habitable bedroom. The architect required structural input for the ridge beam, new floor joists, staircase opening steel, and a rear dormer frame — coordinated with the planning drawings before Building Control submission.

What We Delivered

Structural design for the ridge beam, new floor structure, trimming joists around the staircase opening, and the dormer structural frame. Calculations and coordinated structural drawings issued as a complete Building Control pack.

No Building Control queries. The structural package was issued to the contractor in time to proceed immediately after planning consent. Project completed on programme.

Homebuyer

Pre-Purchase Structural Survey — Crack Assessment

Catford, Lewisham
January 2024Inspection within 3 working days; report within 5
The Situation

A homebuyer's RICS surveyor had flagged diagonal cracking above the rear ground-floor window opening and at the junction between the rear extension and the original structure, recommending a structural engineer's opinion before exchange.

What We Delivered

Structural inspection and written report identifying the cracking above the window as consistent with lintel corrosion expansion. The extension junction cracking was assessed as cosmetic differential settlement, stable and requiring monitoring rather than intervention.

The client proceeded with the purchase with confidence, having negotiated a modest reduction in the asking price to cover lintel replacement.

Residential

Rear Extension Structural Package — Semi-Detached

Orpington, Bromley
September 20234 weeks — full structural package
The Situation

A homeowner in Bromley required a full structural engineering package for a two-storey rear extension to an inter-war semi-detached property. The architect had completed the planning drawings and required structural design for Building Control submission.

What We Delivered

Foundation design, new structural frame calculations for the two-storey extension, steel beam design for the opening, roof design, and a complete coordinated structural drawing set issued alongside the architectural package.

Building Control submission approved. Site works proceeded without structural queries or design changes.

Survey

Structural Survey and Remedial Design — Settlement Cracks

Eltham, Greenwich
May 20236 months monitoring; report issued within 5 days of inspection
The Situation

A property in Eltham had developed a pattern of diagonal cracking in the external brickwork at the rear corner. The owner was concerned about subsidence and required a clear diagnosis.

What We Delivered

Structural inspection and written report diagnosing the cracking as consistent with differential settlement, with recommended monitoring period and indicative remedial options.

Following a six-month stable period, movement was confirmed as historic and complete. No underpinning was required.

Commercial

Commercial Fit-Out Structural Assessment — Office to Residential

Shoreditch, London EC2
November 20233 weeks — assessment and Building Control report
The Situation

A developer converting an upper-floor commercial space to two residential units required structural assessment of the existing floor structure, design of partition support arrangements, and a structural report for the change-of-use Building Control submission.

What We Delivered

Assessment of the existing floor structure against residential imposed loading, confirmation of adequacy, design of load-bearing partition arrangements, and a structural report for the Building Control submission.

Building Control submission approved. The structural assessment confirmed that no major structural intervention was required — directly affecting the project's financial viability.